Data
Recollection Instructions
GemPro
provides the ability to re-collect a specified date or a
group of dates. This feature is usually only
needed should you experience a break in transmission
when collecting your outstanding data. Although
this is not common, it is inconvenient when it occurs
making this feature extremely useful when needed.
The
procedure to re-collect specific dates is as follows.
-
Connect
to your ISP (Internet Service Provider).
-
Close
your charting software or any charts that may be
open.
-
If
the Portfolio grid is open, then close the grid to
show the main menu list. Click the I-Net menu
item and select Re-Collect
Specific Dates from
the drop down list.
-
Select
the Single Day or Group
of Days option.
-
Enter
the Day (or Start and End Dates) to collect.
Please use the down or up arrows next to the date
box to scroll the dates forward or backward, as this
ensures the date format is retained. Also,
please ensure the dates entered are actual trading
days and not a weekend date or public holiday.
-
Click
the Collect
Specific Dates button.

The
yellow progress bar will turn blue as your outstanding
data is downloaded. After the data download has
completed a screen showing a list of the files collected
will be displayed.
After
a short pause, as indicated by the red timer bar, the
Data Distribution process should commence automatically
if your System parameter for Auto Distribute is set to
‘Yes’. (Auto Distribute is set to ‘Yes’ by
default when you install GemPro)
If,
however, the Auto Distribute paramater is set to
‘No’ then you will need to click the Distribute
Now button to commence
the distribution process.
If
you do not want to distribute the data at this time then
you can either cancel or pause the distribution process
by clicking the appropriate button.
|